us-b280-doc-# Title Author(s) Topic(s) Last Updated
518-v1 P0D Update Norm J. Buchanan P0D Installation
13 Jul 2009
513-v1 JPARC-KEK bus schedule, TOKAI station-JPARC bus US-B280 Collaboration Travel
03 Jul 2009
511-v1 TFB Serial Number Map Jordan Webster P0D Installation
30 Jun 2009
507-v1 Integration Update Norm J. Buchanan P0D Installation
30 Jun 2009
506-v1 P0D Update June 30, 2009 Norm J. Buchanan P0D Installation
29 Jun 2009
501-v1 hadron fsi Steve Dytman US-B280
23 Jun 2009
495-v1 P0D Update (Pit) Norm J. Buchanan P0D Installation
22 Jun 2009
493-v1 Pedestal Update Melanie Day P0D Calibration
18 Jun 2009
478-v1 Pedestal, Bias Voltage and Crosstalk Melanie Day P0D Calibration
01 Jun 2009
469-v1 Documentation for the Water Slow Control GUI v1.0 Scott C Davis P0D Slow Control
20 May 2009
473-v1 Pedestal Analysis Melanie Day P0D
25 May 2009
472-v1 First look at upstream ECAL calibrated cosmic muon data Phuoc Trung Le P0D Calibration
25 May 2009
458-v1 Utilitites instrallation details David Warner P0D Installation
11 May 2009
457-v2 Installation Schedule Update Norm J. Buchanan P0D Installation
11 May 2009
456-v1 Cable and Service Installation David Warner P0D Mounting and Utilities
11 May 2009
332-v1 p0dule scans Dmitriy Beznosko P0Dule Scanner
05 May 2009
444-v1 Integration Update Norm J. Buchanan P0D Installation
28 Apr 2009
439-v1 JPARC Shipping Label Norm J. Buchanan P0D Installation
27 Apr 2009
428-v1 Shower energy calibration using pizero invariant mass Phuoc Trung Le P0D Calibration
03 Apr 2009
423-v1 The analysis of LIS data Vladimir Kravtsov P0D Calibration
24 Mar 2009
422-v1 CCQE in the P0D Norm J. Buchanan P0D Software and Analysis
20 Mar 2009
416-v1 CSU SuperP0D Darknoise Analysis Daniel G Ruterbories P0D
17 Mar 2009
415-v1 Installation update - March 17, 2009 Norm J. Buchanan P0D Installation
17 Mar 2009
412-v1 March 17 Technical Board Update Norm J. Buchanan P0D Installation
16 Mar 2009
394-v2 Shipping planning spreadsheet Norm J. Buchanan P0D Installation
10 Mar 2009
395-v1 Shipping Plan Norm J. Buchanan P0D Installation
10 Mar 2009
409-v1 SBU Production Update, March 10 Walter Toki P0D Installation
10 Mar 2009
405-v1 Task sorted items list Norm J. Buchanan P0D Installation
03 Mar 2009
403-v1 P0D Checkout and Installation Schedule Norm J. Buchanan P0D Installation
26 Feb 2009
401-v1 Update of SBU Production, Feb 24 Walter Toki P0D Installation
24 Feb 2009
386-v2 Traveler for Target Super-P0Dule Assembly Clark McGrew Super-P0Dules
30 Jan 2009
384-v1 P0D Installation Update - Jan 20, 2009 Norm J. Buchanan P0D Installation
20 Jan 2009
382-v1 P0D Installation Schedule - ver. 2 Norm J. Buchanan P0D Installation
16 Jan 2009
369-v1 P0D Electronics Cooling Tests Walter Toki P0D Cooling
09 Dec 2008
368-v1 SBU Production Update (Dec 9) Walter Toki P0Dule Assembly and Misc Components
09 Dec 2008
361-v1 Production at SBU Walter Toki P0D Mounting and Utilities
06 Dec 2008
338-v4 P0D Installation Schedule - ver. 1 Norm J. Buchanan P0D Installation
05 Dec 2008
360-v2 Installation update - Dec 6, 2008 Norm J. Buchanan P0D Installation
05 Dec 2008
357-v1 Technical Board Update Norm J. Buchanan P0D
05 Dec 2008
353-v1 P0D reconstruction/Analysis update Phuoc Trung Le P0D Software and Analysis
05 Dec 2008
343-v2 P0D ECAL labeling and coordinate system drawings Norm J. Buchanan P0D
25 Nov 2008
329-v1 P0D Installation Task/Safety Form (short version) Norm J. Buchanan P0D Installation
03 Nov 2008
322-v1 MPPC connector photos Walter Toki P0Dule Assembly and Misc Components
21 Oct 2008
319-v1 Almond Fish & Roasted Cheese Kevin McFarland US-B280
15 Oct 2008
315-v1 Installation update - Oct 14, 2008 Norm J. Buchanan P0D Installation
14 Oct 2008
306-v1 SBUdatasheet - 080924 Bruce E. Berger P0D Calibration
08 Oct 2008
305-v1 SBUdatasheet - 080929 Bruce E. Berger P0D Calibration
08 Oct 2008
304-v1 SBUdatasheet - 080930 Bruce E. Berger P0D Calibration
08 Oct 2008
302-v1 SBUdatasheet - 081002 Bruce E. Berger P0D Calibration
08 Oct 2008
303-v1 SBUdatasheet - 081001 Bruce E. Berger P0D Calibration
08 Oct 2008
298-v1 Photos of Load Test at SBU, Oct 2, 2008 Walter Toki Super-P0Dules
04 Oct 2008
273-v2 P0D Installation Planning (pass 1) Norm J. Buchanan P0D Installation
18 Aug 2008
272-v1 SuperP0Dule Support and Assembly Design Report David Warner Super-P0Dules
16 Aug 2008
263-v1 numu and SMRD Thomas Kutter SMRD
15 Aug 2008
242-v1 Measurment of PODule thickness Joshua Hignight P0Dule
15 Jul 2008
239-v1 PSiP Testing Update Norm J. Buchanan P0Dule Assembly and Misc Components
01 Jul 2008
232-v1 P0D reconstruction software updates Phuoc Trung Le P0D Software and Analysis
24 Jun 2008
231-v1 P0D Status for 24 June 2008 Clark McGrew P0D
24 Jun 2008
227-v0 Executive Committee Activities Chang Kee Jung US-B280
24 Jun 2008
225-v1 P0Dule dimensions-June 17, 2008 Walter Toki P0Dule Assembly and Misc Components
US-B280
17 Jun 2008
222-v1 P0D Assembly Shift Summer 2008 Chang Kee Jung P0D
23 May 2008
218-v1 Bar and Plank Production, May 6, 2008 Walter Toki P0D Scintillator and Planks
06 May 2008
217-v1 Bar and Planks Update, April 29, 2008 Walter Toki P0D Scintillator and Planks
29 Apr 2008
199-v1 P0D water target system: status update Hans G. Berns et al. P0D Water Targets
16 Apr 2008
198-v1 GPS system and monitor electronics: progress report from UW Hans G. Berns et al. Beamline
16 Apr 2008
197-v1 Photosensor testing update Norm J. Buchanan P0Dule
08 Apr 2008
196-v1 First MPPC Data with TFB at CSU Robert Wilson P0D
01 Apr 2008
189-v1 Superconducting Corrector Coil Status Peter Wanderer Beamline
10 Mar 2008
169-v1 MPPC Delivery Walter Toki P0Dule Assembly and Misc Components
SMRD
04 Mar 2008
157-v1 Corrector Update Peter Wanderer Beamline
15 Feb 2008
146-v1 P0Dule Mapper Update Robert Bradford P0Dule Scanner
22 Jan 2008
107-v0 Executive Committee Activities, Funding Update Chang Kee Jung US-B280
11 Dec 2007
119-v0 Scintillator Production Status Kevin McFarland P0D Scintillator and Planks
11 Dec 2007
135-v1 SMRD Recon Thomas Kutter SMRD
15 Dec 2007
112-v0 P0D Clark McGrew P0D
11 Dec 2007
111-v0 ND280 Convenors/Technical Board Meeting Report Chiaki Yanagisawa US-B280
11 Dec 2007
129-v1 071215 SMRD Status Update Thomas Kutter SMRD
15 Dec 2007
122-v1 Superconduction Corrector Coil Status Peter Wanderer Beamline
13 Dec 2007
118-v0 Fiber Assemblies Kevin McFarland P0D Fiber and Connectors
11 Dec 2007
117-v0 Slow Control and Monitoring Jeff Wilkes P0D Slow Control
11 Dec 2007
116-v0 Water Target Prototype Jeff Wilkes P0D Water Targets
11 Dec 2007
115-v0 Status and Schedule Clark McGrew P0D
11 Dec 2007
113-v0 SMRD Thomas Kutter SMRD
11 Dec 2007
110-v0 Neutrino Horn Eric Zimmerman Horn
11 Dec 2007
109-v0 Beam Monitor Electronics/GPS Jeff Wilkes Beamline
11 Dec 2007
108-v0 Superconducting Corrector Coil Peter Wanderer Beamline
11 Dec 2007
104-v1 Dry Air requirements for the P0D Walter Toki P0D Cooling
27 Nov 2007
100-v1 Bladder fiducial volume uncertainty due to center spine Jeff Wilkes P0D Water Targets
13 Nov 2007
99-v1 GPS system progress report 11/13/07 - Jeff Wilkes Jeff Wilkes Beamline
US-B280
13 Nov 2007
96-v1 SMRD status overview Thomas Kutter SMRD
US-B280
13 Nov 2007
95-v1 corrector magnets Peter Wanderer Beamline
13 Nov 2007
93-v1 TFB electronics workshop Istvan Danko Trip-t Electronics
US-B280
13 Nov 2007
90-v1 Target Radiator Model David Warner P0Dule
12 Nov 2007
89-v1 ECAL Radiator David Warner P0Dule
12 Nov 2007
82-v2 P0Dule STEP Model David Warner P0Dule
12 Nov 2007
83-v2 US and Central ECAL SuperP0Dule STEP Models David Warner Super-P0Dules
12 Nov 2007
84-v1 US and Central Target SuperP0Dule STEP Models David Warner Super-P0Dules
12 Nov 2007
86-v1 Preliminary Estimates of P0D Dry Air Requirements Walter Toki P0D Cooling
06 Nov 2007
85-v1 Status of TFB Workshop Donna Naples Trip-t Electronics
06 Nov 2007
51-v3 Scanner DAQ Dmitriy Beznosko P0D Calibration
22 Oct 2007
11-v1 Scanner Electronics Spreadsheet Kevin McFarland P0Dule Scanner
19 Jun 2007
66-v1 P0D Light Yield Kevin McFarland P0D Fiber and Connectors
P0D Scintillator and Planks
26 Sep 2007
65-v1 P0D Scanner for T2K Meeting Design Review Kevin McFarland P0Dule Scanner
26 Sep 2007
55-v4 P0Dule Production Planning Glenn Lopez P0Dule
09 Sep 2007
50-v2 Water Target and P0D slow control and monitoring Jeff Wilkes P0D Slow Control
09 Sep 2007
41-v3 GPS system and beam monitors - Jeff Wilkes Jeff Wilkes Beamline
08 Sep 2007
40-v1 Corrector Status Peter Wander P0D Slow Control
07 Sep 2007
34-v0 P0D Status and Schedule Clark McGrew P0D
30 Aug 2007
29-v1 Status of BNL correctors Peter Wander US-B280
02 Aug 2007
16-v1 Task "to do" lists for the P0D Clark McGrew P0D
28 Jun 2007
13-v1 Assembly Table Work Surface Clark McGrew P0Dule Assembly and Misc Components
26 Jun 2007
8-v1 Proposal for Participation in the T2K Long-baseline Neutrino Oscillation Experiment US-B280 Collaboration P0D
Beamline
Horn
Trip-t Electronics
SMRD
US-B280
17 Jun 2007
6-v1 P0D Background and Signal Versus Granularity Kenkou Kobayashi et al. P0D Software and Analysis
17 Jun 2007
5-v1 First P0Dule Prototype Tests Phuoc Trung Le et al. P0Dule
17 Jun 2007
4-v1 Preliminary P0D pizero Save Efficiency Clark McGrew P0D Software and Analysis
17 Jun 2007
3-v1 Response of D0 Scintillator Bars in the ND280mc Clark McGrew P0D
17 Jun 2007
2-v1 NuSAG Presentation: US Participation in the T2K Beamline and 280m Near Detector Chang Kee Jung US-B280
14 Jun 2007
Number of documents found: 117