Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on P0D and sub-topics are available:
(List events on P0D)

us-b280-doc-# Title Author(s) Topic(s) Last Updated
2048-v1 P0D CC1pi+ Kalman-Track Calibrated Momentum Tool Daniel Cherdack et al. P0D
02 May 2017
2029-v1 P0D Regular Meeting Walter Toki P0D
28 Nov 2016
2010-v1 P0D Water Rack Valve Panel Measurements Matthew G Hogan P0D
16 May 2016
2002-v1 US-T2K Apartments maps / 2016 Jeff Wilkes US-B280
P0D
28 Apr 2016
1997-v1 Muon and Charged Pion PID with the T2K Pi-Zero Detector Matthew G Hogan P0D Software and Analysis
12 Apr 2016
1991-v1 P0D Status Report March 29 Zoya Vallari P0D
28 Mar 2016
1990-v1 P0D Status Report March 15 Zoya Vallari P0D
14 Mar 2016
1989-v1 P0D Status Report March 7 Zoya Vallari P0D
07 Mar 2016
1980-v1 P0D Regular Meeting, Sept 14, 2015 Walter Toki P0D
14 Sep 2015
1957-v1 Update on NC1pi0 Analysis for P6 Zoya Vallari P0D
12 May 2015
1915-v1 P0D Update 12-15-14 Paul Rojas P0D
15 Dec 2014
1910-v1 P0DCC0pi/inc highland2 migration Tianlu Yuan P0D
05 Dec 2014
1902-v1 P0D Regular Meeting, November 10, 2014 Walter Toki P0D
10 Nov 2014
1901-v1 P0D highland and xstool walkthrough Tianlu Yuan P0D Software and Analysis
04 Nov 2014
1882-v1 P0DLI Data, Run V Daniel Cherdack P0D
22 Sep 2014
1876-v1 P0D Update Alex Clifton P0D
15 Sep 2014
1867-v1 Run6 P0D expert shifts and ND280 shifts Walter Toki P0D
25 Aug 2014
1850-v1 SiPM-based P0D Upgrade Concept Norm J. Buchanan P0D Water Targets
14 Jul 2014
1837-v5 P0D LI II: The Search for Spares Daniel Cherdack P0D
23 Jun 2014
1841-v1 P0D report, June 24 Walter Toki P0D Mounting and Utilities
23 Jun 2014
1821-v1 P0D Water Monitoring Summary for Non-Water Experts Alex Clifton P0D Water Targets
12 May 2014
1820-v1 P0D Water Summary Document tutorial Alex Clifton P0D Water Targets
12 May 2014
1819-v1 P0D Weekly Report Damon G Hansen P0D
12 May 2014
1806-v1 April 8, 2014 P0D update Alex Clifton P0D Water Targets
07 Apr 2014
1799-v1 April 1, 2014 P0D update Alex Clifton P0D Water Targets
31 Mar 2014
1795-v1 March 25, 2014 P0D Update Alex Clifton P0D
24 Mar 2014
1794-v1 P0D shifts in Spring 2014 run and Update on P0D Upgrade Walter Toki P0D
17 Mar 2014
1793-v1 March 18, 2014 P0D Update Alex Clifton P0D
17 Mar 2014
1789-v1 Top-Off and Electronics Checkout Alex Clifton P0D
10 Mar 2014
1784-v1 P0D Update Alex Clifton P0D Water Targets
03 Mar 2014
1781-v1 Bag 19 Top-off and Water Status Alex Clifton P0D Water Targets
24 Feb 2014
1779-v1 P0D Water Update Alex Clifton P0D Water Targets
17 Feb 2014
1774-v1 Third P0D Water Bag Replacement? Bruce E. Berger P0D Water Targets
10 Feb 2014
1768-v1 P0D Water Update and Revised Plan Alex Clifton P0D Water Targets
03 Feb 2014
1752-v1 P0D Water Sensor Replacement and Fill Alex Clifton P0D Water Targets
16 Dec 2013
1744-v1 January Water Sensor Replacement Options Alex Clifton P0D Water Targets
02 Dec 2013
1743-v1 P0D Early 2014 Work Bruce E. Berger P0D
25 Nov 2013
1736-v2 P0D Water Update Nov 11 2013 Paul Rojas P0D Water Targets
11 Nov 2013
1732-v1 Contained and Side-Exiting CCQE BANFF discussion Damon G Hansen P0D Software and Analysis
29 Oct 2013
1723-v1 P0D Water Update2 Alex Clifton P0D Water Targets
21 Oct 2013
1721-v1 P0D Water Update Scott C Davis P0D Water Targets
21 Oct 2013
1714-v1 Flasher Cut - Energy Scale Joshua Hignight et al. P0D
12 Sep 2013
1711-v1 ES - Flasher Cut Joshua Hignight et al. P0D
29 Aug 2013
1706-v1 Enegy Scale - Charge Profile Joshua Hignight et al. P0D
22 Aug 2013
1702-v1 Energy Scale - Study Joshua Hignight et al. US-B280
P0D
15 Aug 2013
1698-v1 Anti-Neutrino Estimates for P0D upgrade Walter Toki P0D Cooling
12 Aug 2013
1690-v1 Items Above Bag 43 Bruce E. Berger P0D
29 Jul 2013
1685-v1 update on 5F cosmics efficiencies Tianlu Yuan P0D
19 Jul 2013
1687-v1 Energy Scale - Study Joshua Hignight et al. P0D
18 Jul 2013
1671-v1 P0D Meeting Walter Toki P0D Software and Analysis
01 Jul 2013
1670-v1 Energy Scale - Study Joshua Hignight et al. P0D
27 Jun 2013
1668-v1 Energy Scale Jose Palomino P0D
20 Jun 2013
1664-v1 EScale Joshua Hignight et al. P0D
13 Jun 2013
1661-v1 EScale Joshua Hignight et al. P0D
06 Jun 2013
1657-v1 Neural Network ROOT Jose Palomino P0D
US-B280
30 May 2013
1656-v1 Undergraduate Thesis Presentation Jae Hong Kim P0D
02 May 2013
1649-v1 Basic Fortran 77 Jose Palomino P0D
15 Apr 2013
1648-v1 Residuals MC Nue Jose Palomino P0D
14 Apr 2013
1647-v1 Wall distances MC Jose Palomino P0D
14 Apr 2013
1646-v1 Vertex Distributions Jose Palomino P0D
14 Apr 2013
1645-v1 Playing with MC - II Jose Palomino P0D
14 Apr 2013
1644-v1 Playing with MC Jose Palomino P0D
14 Apr 2013
1637-v1 P0D Alignment APS talk Alex Clifton P0D Software and Analysis
09 Apr 2013
1629-v1 Contour plot for senior thesis Jae Hong Kim P0D
08 Apr 2013
1622-v1 Early March Startup and P0D expert shifts Walter Toki P0D Mounting and Utilities
18 Mar 2013
1616-v1 Weekly senior thesis update Jae Hong Kim P0D
10 Mar 2013
1613-v1 Weekly Senior Thesis Update Jae Hong Kim P0D
03 Mar 2013
1602-v1 Track Matching Efficiency Using SandMuons Update Alex Clifton P0D Software and Analysis
21 Feb 2013
1599-v1 Weekly senior thesis update Jae Hong Kim Super-P0Dules
17 Feb 2013
1595-v2 PěD-TPC1 CC inc update: T2P match optimization Erez Reinherz-Aronis P0D Software and Analysis
07 Feb 2013
1594-v1 Bag 43 Thoughts Bruce E. Berger P0D Water Targets
04 Feb 2013
1590-v1 P0D premeeting agenda Walter Toki P0D Mounting and Utilities
14 Jan 2013
1581-v1 PěD-TPC1 CC inclusive analysis: systematic update Erez Reinherz-Aronis P0D Software and Analysis
20 Dec 2012
1569-v1 Using Sand Muons to Evaluate P0D + TPC Reconstruction Efficiencies for a CC Inclusive Analysis Alex Clifton P0D Software and Analysis
04 Dec 2012
1557-v4 PěD Weekly Report - Nov. 13 (JST) Erez Reinherz-Aronis P0D
12 Nov 2012
1552-v1 P0D operations Update, Nov 5 Walter Toki P0D
05 Nov 2012
1536-v1 Track efficiency study using sand-muons Alex Clifton et al. P0D Software and Analysis
11 Oct 2012
1522-v3 PěD-Tracker CC inclusive analysis Production 4 & 5 Update Erez Reinherz-Aronis P0D Software and Analysis
14 Sep 2012
1519-v1 How to calculate Neutrino Oscillations with the matter effect in 3 different ways using graduate level Quantum Mechanics Walter Toki P0D Water Targets
11 Sep 2012
1493-v4 Preliminary ND280 Alignment Results Alex Clifton et al. P0D Calibration
03 Sep 2012
1507-v1 Sensort Reconfiguration Proposal Bruce E. Berger P0D Water Targets
03 Sep 2012
1471-v4 ND280 alignment task Erez Reinherz-Aronis P0D
30 Jul 2012
1468-v1 ND280 Alignment: Pendulum Method Alex Clifton P0D
30 Jul 2012
1462-v1 P0D Water Bag Replacement Fixture Tests Bruce E. Berger P0D
23 Jul 2012
1460-v1 Water sensor current check and test sensor setup Alex Clifton P0D Water Targets
23 Jul 2012
1449-v1 Nicked Tube Location David Warner P0D
10 Jul 2012
1448-v1 Water Target Work Schedule for the Week of July 9th 2012 Daniel Cherdack P0D Water Targets
09 Jul 2012
1447-v1 P0D Summer Work Initial Campaign Bruce E. Berger P0D
09 Jul 2012
1444-v1 Pictures of SuperP0Dule Lifting Fixture Design David Warner P0D
03 Jul 2012
1439-v1 Summer Plan update Walter Toki P0D Installation
25 Jun 2012
1431-v1 P0D Summer Work Review Draft 120612 David Warner P0D
12 Jun 2012
1430-v1 P0D summer plans (non-water bag replacement) Walter Toki P0D Mounting and Utilities
11 Jun 2012
1423-v2 P0D Summer Work Schedule Bruce E. Berger P0D
14 May 2012
1412-v1 PěD Summer 2012 Work Update Bruce E. Berger P0D Water Targets
09 Apr 2012
1402-v1 P0D nue with new BANFF weights Philip Rodrigues P0D
22 Mar 2012
1397-v1 Draft 2012 Summer Work Schedule David Warner P0D
05 Mar 2012
1396-v1 JPARC report Walter Toki P0D Mounting and Utilities
05 Mar 2012
1359-v1 Cable Clearance Bruce E. Berger P0D Mounting and Utilities
19 Dec 2011
1357-v1 PěD Repair Summary Bruce E. Berger P0D
12 Dec 2011
1347-v1 PěD Repair Update Bruce E. Berger P0D
21 Nov 2011
1346-v1 January start up Planning Walter Toki P0D Installation
21 Nov 2011
1345-v1 Comments on Nu Mu Tech note Walter Toki P0D Software and Analysis
17 Nov 2011
1337-v2 PěD Repair Update Bruce E. Berger P0D
07 Nov 2011
1332-v1 PěD Repair Update Bruce E. Berger P0D
31 Oct 2011
1318-v1 PěD Repair Plans Bruce E. Berger P0D
10 Oct 2011
1285-v1 Charge-flow P0D reconstruction Norm J. Buchanan P0D Software and Analysis
06 Sep 2011
1282-v1 Restoring PěD Operations Bruce E. Berger P0D
06 Sep 2011
1276-v1 P0D Upgrade Discussion Walter Toki P0D
US-B280
06 Sep 2011
1235-v3 Optimizing P0D Fiducial Cuts Erez Reinherz-Aronis P0D Software and Analysis
04 Aug 2011
1200-v1 Dan's pi0 cross-section systematic slides, 6/26 Daniel G Ruterbories P0D
06 Jul 2011
1178-v3 Fiducial Volume systematics Jaclyn Schwehr P0D Software and Analysis
06 Jul 2011
1199-v1 Global tracks time structure in a bunch Erez Reinherz-Aronis US-B280
P0D Software and Analysis
05 Jul 2011
1177-v2 P0D Reconstruction Systematics Norm J. Buchanan P0D
15 Jun 2011
1170-v1 The P0D Detector Norm J. Buchanan P0D
08 Jun 2011
1166-v1 ShowerSystematics-update1 Fahmida Khanam P0D Software and Analysis
08 Jun 2011
1162-v1 P0D Reconstruction Systematics Norm J. Buchanan P0D Software and Analysis
03 Jun 2011
1156-v2 Bunch Structure Update Erez Reinherz-Aronis P0D Software and Analysis
02 Jun 2011
1139-v2 Nue systematics Philip Rodrigues P0D
12 May 2011
1137-v6 Update: Run1 vs Run2 & water-out/water-in ratio Erez Reinherz-Aronis P0D Software and Analysis
11 May 2011
1136-v1 Variation in P0D response with time Philip Rodrigues P0D Calibration
05 May 2011
1134-v2 Nue systematics Philip Rodrigues P0D
05 May 2011
1126-v1 Width PID and systematics Philip Rodrigues P0D
28 Apr 2011
1122-v1 April APS Talk: Joshua Hignight Joshua Hignight P0D
US-B280
26 Apr 2011
1117-v1 Data/MC comparisons of sand mu widths Philip Rodrigues P0D
20 Apr 2011
1111-v1 Even more nue PID things Philip Rodrigues P0D
14 Apr 2011
1101-v1 P0D Event times Tianlu Yuan P0D Software and Analysis
07 Apr 2011
1098-v1 Shower Energy Scale: Hit Charge Distributions Bruce E. Berger P0D Calibration
06 Apr 2011
1095-v1 More nue PID things Philip Rodrigues P0D
06 Apr 2011
1084-v1 Further approaches to nue analysis Philip Rodrigues P0D
01 Apr 2011
1068-v1 Particle ID in P0D nue analysis Philip Rodrigues P0D
24 Mar 2011
1061-v1 Pi0 backgrounds in nue sample, and TPC vetoing Philip Rodrigues P0D
17 Mar 2011
1056-v1 P0D nue thoughts for discussion Philip Rodrigues P0D
10 Mar 2011
1048-v2 More on back exiting tracks (again) Philip Rodrigues P0D
03 Mar 2011
1047-v1 More on back exiting tracks Philip Rodrigues P0D
03 Mar 2011
1043-v1 Draft Summer Work Plans Walter Toki P0D Installation
28 Feb 2011
1027-v1 First look at back-exiting tracks from the P0D Philip Rodrigues P0D
10 Feb 2011
1026-v1 First Selection Cuts for Trackless Michel Code Damon G Hansen P0D Software and Analysis
10 Feb 2011
981-v1 Bag 28 Level Drop Discussion Walter Toki P0D Water Targets
03 Jan 2011
968-v1 JPARC report Karin E Gilje P0D
29 Nov 2010
948-v1 soffTasks Information Matthew Bass P0D Calibration
09 Nov 2010
936-v1 Data/MC comparisons of P0D nue search variables Philip Rodrigues P0D
03 Nov 2010
932-v2 P0D Standard Water Levels Clark McGrew P0D Water Targets
02 Nov 2010
917-v1 Basic Global Reconstruction Checks Raj Das P0D
21 Oct 2010
883-v1 TPC Veto for Events Originating in the P0D Damon G Hansen P0D Software and Analysis
24 Sep 2010
866-v1 Upgrade milestones for September-November Norm J. Buchanan P0D Water Targets
14 Sep 2010
865-v1 Personnel and Tasks for Water Upgrade (Sep 13, 2010) Norm J. Buchanan P0D Water Targets
13 Sep 2010
860-v1 CC-Inclusive study in P0D (Update) Raj Das P0D
09 Sep 2010
855-v1 Michel Electron Code Damon G Hansen P0D
07 Sep 2010
843-v1 Water update Norm J. Buchanan P0D Water Targets
30 Aug 2010
839-v1 PěD Preparations for November Running - Calibration-Related issues Bruce E. Berger P0D
30 Aug 2010
813-v1 Upgrade personnel amd tasks Norm J. Buchanan P0D Water Targets
26 Jul 2010
787-v1 JPARC report Karin E Gilje P0D
28 Jun 2010
775-v1 P0D Water Update Norm J. Buchanan P0D Water Targets
14 Jun 2010
764-v1 Revised Testing Plan Norm J. Buchanan P0D Water Targets
31 May 2010
756-v1 P0D report from JPARC Walter Toki P0D Installation
24 May 2010
755-v1 Middle Processing results Joshua Hignight P0D Calibration
24 May 2010
743-v1 DPT/Pedestal Initial Comparison Jaclyn Schwehr P0D Calibration
10 May 2010
742-v1 dpt v1 Jaclyn Schwehr P0D Calibration
06 May 2010
738-v1 P0D Update Norm J. Buchanan P0D
03 May 2010
734-v2 PID Overview Kevin Connolly P0D
US-B280
03 May 2010
728-v1 Water target system plan Norm J. Buchanan P0D Water Targets
28 Apr 2010
723-v1 P0D Operations Norm J. Buchanan P0D
26 Apr 2010
712-v4 First look at First Pass Pedestal Runs Joshua Hignight P0D Calibration
12 Apr 2010
680-v1 ND280 Run Coordination Report Norm J. Buchanan P0D
09 Mar 2010
676-v1 P0D Update Norm J. Buchanan P0D
08 Mar 2010
659-v1 Event Display Joshua Hignight P0D Software and Analysis
16 Feb 2010
640-v1 P0D Status Feb 2, 2010 Norm J. Buchanan P0D
01 Feb 2010
635-v1 P0D Shower Reconstruction Efficiency Melanie Day P0D Software and Analysis
20 Jan 2010
633-v1 Investigating Current P0D Shower Reconstruction Melanie Day P0D Software and Analysis
13 Jan 2010
599-v1 Status of software for P0D calibration with cosmic muons Vladimir Kravtsov P0D Calibration
24 Nov 2009
598-v1 Online Monitoring Melanie Day P0Dule Quality Control
23 Nov 2009
578-v1 P0D bias mapper Dmitriy Beznosko P0D Calibration
Trip-t Electronics
17 Nov 2009
567-v1 P0D Integration Report 15 October 2009 Kevin McFarland P0D Installation
15 Oct 2009
566-v1 P0D Integration Report 15 October 2009 Kevin McFarland P0D Installation
15 Oct 2009
553-v1 P0D remaining installation tasks Norm J. Buchanan P0D Installation
08 Oct 2009
551-v1 ChronoBunching Melanie Day P0D Calibration
06 Oct 2009
542-v1 P0D Installation Update Norm J. Buchanan P0D Installation
15 Sep 2009
541-v1 P0D Update Norm J. Buchanan P0D Installation
14 Sep 2009
538-v1 P0D Update Norm J. Buchanan P0D Installation
07 Sep 2009
534-v1 P0D Update Norm J. Buchanan P0D Installation
24 Aug 2009
531-v1 P0D Update Norm J. Buchanan P0D Installation
17 Aug 2009
526-v1 First look at cosmic data from water target Phuoc Trung Le P0D Calibration
10 Aug 2009
518-v1 P0D Update Norm J. Buchanan P0D Installation
13 Jul 2009
511-v1 TFB Serial Number Map Jordan Webster P0D Installation
30 Jun 2009
507-v1 Integration Update Norm J. Buchanan P0D Installation
30 Jun 2009
506-v1 P0D Update June 30, 2009 Norm J. Buchanan P0D Installation
29 Jun 2009
495-v1 P0D Update (Pit) Norm J. Buchanan P0D Installation
22 Jun 2009
493-v1 Pedestal Update Melanie Day P0D Calibration
18 Jun 2009
478-v1 Pedestal, Bias Voltage and Crosstalk Melanie Day P0D Calibration
01 Jun 2009
469-v1 Documentation for the Water Slow Control GUI v1.0 Scott C Davis P0D Slow Control
20 May 2009
473-v1 Pedestal Analysis Melanie Day P0D
25 May 2009
472-v1 First look at upstream ECAL calibrated cosmic muon data Phuoc Trung Le P0D Calibration
25 May 2009
458-v1 Utilitites instrallation details David Warner P0D Installation
11 May 2009
457-v2 Installation Schedule Update Norm J. Buchanan P0D Installation
11 May 2009
456-v1 Cable and Service Installation David Warner P0D Mounting and Utilities
11 May 2009
332-v1 p0dule scans Dmitriy Beznosko P0Dule Scanner
05 May 2009
444-v1 Integration Update Norm J. Buchanan P0D Installation
28 Apr 2009
439-v1 JPARC Shipping Label Norm J. Buchanan P0D Installation
27 Apr 2009
428-v1 Shower energy calibration using pizero invariant mass Phuoc Trung Le P0D Calibration
03 Apr 2009
423-v1 The analysis of LIS data Vladimir Kravtsov P0D Calibration
24 Mar 2009
422-v1 CCQE in the P0D Norm J. Buchanan P0D Software and Analysis
20 Mar 2009
416-v1 CSU SuperP0D Darknoise Analysis Daniel G Ruterbories P0D
17 Mar 2009
415-v1 Installation update - March 17, 2009 Norm J. Buchanan P0D Installation
17 Mar 2009
412-v1 March 17 Technical Board Update Norm J. Buchanan P0D Installation
16 Mar 2009
394-v2 Shipping planning spreadsheet Norm J. Buchanan P0D Installation
10 Mar 2009
395-v1 Shipping Plan Norm J. Buchanan P0D Installation
10 Mar 2009
409-v1 SBU Production Update, March 10 Walter Toki P0D Installation
10 Mar 2009
405-v1 Task sorted items list Norm J. Buchanan P0D Installation
03 Mar 2009
403-v1 P0D Checkout and Installation Schedule Norm J. Buchanan P0D Installation
26 Feb 2009
401-v1 Update of SBU Production, Feb 24 Walter Toki P0D Installation
24 Feb 2009
386-v2 Traveler for Target Super-P0Dule Assembly Clark McGrew Super-P0Dules
30 Jan 2009
384-v1 P0D Installation Update - Jan 20, 2009 Norm J. Buchanan P0D Installation
20 Jan 2009
382-v1 P0D Installation Schedule - ver. 2 Norm J. Buchanan P0D Installation
16 Jan 2009
369-v1 P0D Electronics Cooling Tests Walter Toki P0D Cooling
09 Dec 2008
368-v1 SBU Production Update (Dec 9) Walter Toki P0Dule Assembly and Misc Components
09 Dec 2008
361-v1 Production at SBU Walter Toki P0D Mounting and Utilities
06 Dec 2008
338-v4 P0D Installation Schedule - ver. 1 Norm J. Buchanan P0D Installation
05 Dec 2008
360-v2 Installation update - Dec 6, 2008 Norm J. Buchanan P0D Installation
05 Dec 2008
357-v1 Technical Board Update Norm J. Buchanan P0D
05 Dec 2008
353-v1 P0D reconstruction/Analysis update Phuoc Trung Le P0D Software and Analysis
05 Dec 2008
343-v2 P0D ECAL labeling and coordinate system drawings Norm J. Buchanan P0D
25 Nov 2008
329-v1 P0D Installation Task/Safety Form (short version) Norm J. Buchanan P0D Installation
03 Nov 2008
322-v1 MPPC connector photos Walter Toki P0Dule Assembly and Misc Components
21 Oct 2008
315-v1 Installation update - Oct 14, 2008 Norm J. Buchanan P0D Installation
14 Oct 2008
306-v1 SBUdatasheet - 080924 Bruce E. Berger P0D Calibration
08 Oct 2008
305-v1 SBUdatasheet - 080929 Bruce E. Berger P0D Calibration
08 Oct 2008
304-v1 SBUdatasheet - 080930 Bruce E. Berger P0D Calibration
08 Oct 2008
302-v1 SBUdatasheet - 081002 Bruce E. Berger P0D Calibration
08 Oct 2008
303-v1 SBUdatasheet - 081001 Bruce E. Berger P0D Calibration
08 Oct 2008
298-v1 Photos of Load Test at SBU, Oct 2, 2008 Walter Toki Super-P0Dules
04 Oct 2008
273-v2 P0D Installation Planning (pass 1) Norm J. Buchanan P0D Installation
18 Aug 2008
272-v1 SuperP0Dule Support and Assembly Design Report David Warner Super-P0Dules
16 Aug 2008
242-v1 Measurment of PODule thickness Joshua Hignight P0Dule
15 Jul 2008
239-v1 PSiP Testing Update Norm J. Buchanan P0Dule Assembly and Misc Components
01 Jul 2008
232-v1 P0D reconstruction software updates Phuoc Trung Le P0D Software and Analysis
24 Jun 2008
231-v1 P0D Status for 24 June 2008 Clark McGrew P0D
24 Jun 2008
225-v1 P0Dule dimensions-June 17, 2008 Walter Toki US-B280
P0Dule Assembly and Misc Components
17 Jun 2008
222-v1 P0D Assembly Shift Summer 2008 Chang Kee Jung P0D
23 May 2008
218-v1 Bar and Plank Production, May 6, 2008 Walter Toki P0D Scintillator and Planks
06 May 2008
217-v1 Bar and Planks Update, April 29, 2008 Walter Toki P0D Scintillator and Planks
29 Apr 2008
199-v1 P0D water target system: status update Hans G. Berns et al. P0D Water Targets
16 Apr 2008
197-v1 Photosensor testing update Norm J. Buchanan P0Dule
08 Apr 2008
196-v1 First MPPC Data with TFB at CSU Robert Wilson P0D
01 Apr 2008
169-v1 MPPC Delivery Walter Toki P0Dule Assembly and Misc Components
SMRD
04 Mar 2008
146-v1 P0Dule Mapper Update Robert Bradford P0Dule Scanner
22 Jan 2008
119-v0 Scintillator Production Status Kevin McFarland P0D Scintillator and Planks
11 Dec 2007
112-v0 P0D Clark McGrew P0D
11 Dec 2007
115-v0 Status and Schedule Clark McGrew P0D
11 Dec 2007
116-v0 Water Target Prototype Jeff Wilkes P0D Water Targets
11 Dec 2007
118-v0 Fiber Assemblies Kevin McFarland P0D Fiber and Connectors
11 Dec 2007
117-v0 Slow Control and Monitoring Jeff Wilkes P0D Slow Control
11 Dec 2007
104-v1 Dry Air requirements for the P0D Walter Toki P0D Cooling
27 Nov 2007
100-v1 Bladder fiducial volume uncertainty due to center spine Jeff Wilkes P0D Water Targets
13 Nov 2007
90-v1 Target Radiator Model David Warner P0Dule
12 Nov 2007
89-v1 ECAL Radiator David Warner P0Dule
12 Nov 2007
82-v2 P0Dule STEP Model David Warner P0Dule
12 Nov 2007
83-v2 US and Central ECAL SuperP0Dule STEP Models David Warner Super-P0Dules
12 Nov 2007
84-v1 US and Central Target SuperP0Dule STEP Models David Warner Super-P0Dules
12 Nov 2007
86-v1 Preliminary Estimates of P0D Dry Air Requirements Walter Toki P0D Cooling
06 Nov 2007
51-v3 Scanner DAQ Dmitriy Beznosko P0D Calibration
22 Oct 2007
11-v1 Scanner Electronics Spreadsheet Kevin McFarland P0Dule Scanner
19 Jun 2007
66-v1 P0D Light Yield Kevin McFarland P0D Fiber and Connectors
P0D Scintillator and Planks
26 Sep 2007
65-v1 P0D Scanner for T2K Meeting Design Review Kevin McFarland P0Dule Scanner
26 Sep 2007
55-v4 P0Dule Production Planning Glenn Lopez P0Dule
09 Sep 2007
50-v2 Water Target and P0D slow control and monitoring Jeff Wilkes P0D Slow Control
09 Sep 2007
40-v1 Corrector Status Peter Wander P0D Slow Control
07 Sep 2007
34-v0 P0D Status and Schedule Clark McGrew P0D
30 Aug 2007
16-v1 Task "to do" lists for the P0D Clark McGrew P0D
28 Jun 2007
13-v1 Assembly Table Work Surface Clark McGrew P0Dule Assembly and Misc Components
26 Jun 2007
8-v1 Proposal for Participation in the T2K Long-baseline Neutrino Oscillation Experiment US-B280 Collaboration SMRD
P0D
US-B280
Trip-t Electronics
Beamline
Horn
17 Jun 2007
6-v1 P0D Background and Signal Versus Granularity Kenkou Kobayashi et al. P0D Software and Analysis
17 Jun 2007
5-v1 First P0Dule Prototype Tests Phuoc Trung Le et al. P0Dule
17 Jun 2007
4-v1 Preliminary P0D pizero Save Efficiency Clark McGrew P0D Software and Analysis
17 Jun 2007
3-v1 Response of D0 Scintillator Bars in the ND280mc Clark McGrew P0D
17 Jun 2007

Number of documents found: 274

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.5.5, contact Document Database Administrators
Execution time: 5 wallclock secs ( 2.38 usr + 0.34 sys = 2.72 CPU)