T2K US Beamline and ND280 Collaboration Document 50-v2

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Water Target and P0D slow control and monitoring

Document #:
us-b280-doc-50-v2
Document type:
Presentation
Submitted by:
Jeff Wilkes
Updated by:
Jeff Wilkes
Document Created:
08 Sep 2007, 18:54
Contents Revised:
09 Sep 2007, 10:26
DB Info Revised:
09 Sep 2007, 10:26
Viewable by:
  • Public document
Modifiable by:
Other Versions:
us-b280-doc-50-v1
08 Sep 2007, 18:54
Abstract:
Plans for water target fill/drain system, sensors for temperature and pressure in water bags, and for temperature around photosensors.
Files in Document:
Authors:
Keywords:
monitoring water
Notes and Changes:
combines 2 separate talks shown on agenda. also includes my slides about water bladders, for the record (already thoroughly covered by Dave Warner). slightly changed some slides since v2.
Associated with Events:
held from 08 Sep 2007 to 09 Sep 2007 in SBU Physics D-122
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.5.5, contact Document Database Administrators