T2K US Beamline and ND280 Collaboration Document 84-v1

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

US and Central Target SuperP0Dule STEP Models

Document #:
us-b280-doc-84-v1
Document type:
Drawing
Submitted by:
David Warner
Updated by:
David Warner
Document Created:
29 Oct 2007, 17:14
Contents Revised:
29 Oct 2007, 17:14
DB Info Revised:
12 Nov 2007, 16:02
Viewable by:
  • Public document
Modifiable by:
Abstract:
STEP files of the Target SuperP0Dules
Files in Document:
Authors:
Notes and Changes:
STEP files of the target SuperP0Dules.

As in the ECAL SuperP0Dule models, the z-axis tolerance allowance for the combination of a water target, radiator and P0Dule has been left as an empty gap between these elements. The space is 1.66mm per section (1 section is a combination of a water target, radiator and P0Dule).
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.5.5, contact Document Database Administrators